HYDROPOWER: Canadian tribes threaten to sue over transmission corridor

EnergyWire 2021-07-08

Summary:

A group of Canadian tribes is threatening to sue to stop construction on the Canadian side of the border on a transmission corridor that aims to provide hydropower to the New England power grid.

Link:

https://www.eenews.net/energywire/stories/1063736649/feed

From feeds:

Berkeley Law Library -- Reference & Research Services ยป EnergyWire

Tags:

electricity

Date tagged:

07/08/2021, 10:37

Date published:

07/08/2021, 07:08